The Building

PalaCinema Locarno

The PalaCinema is a multicultural platform for the cinematic arts located in the historical centre of the city of Locarno in Ticino (Switzerland). The city hosts the Locarno Film Festival, so this centre is of particular importance. The Palazzo del Cinema Locarno project is guided by principles of economy, trying to capitalise in the existing structure and the public affection for the Palazzo Scolastico –which used to host the local schools and now hosts a variety of NGOs and community associations, to provide an architectural identity for the new cinema complex. This building is a landmark in the city. At a time when energy resources are dwindling and climate change has become a crucial problem for our cities, it would have been irresponsible to simply discard the existing building in order to build an entirely new one, with the corresponding expenditure of vital resources. Urban Recycling is a more adequate strategy for this intervention. Three levels of action to reduce the emissions have been considered: demand reduction, improved energy efficiency of systems and improved building management.

More Details

The Solution

Solution post-intervention

Solution post-intervention: 2-13-1500x630__Marco de Carli Studio Ingegneria SA.jpg
Solution post-intervention: 3-12-1500x630_Marco de Carli Studio Ingegneria SA.jpg
Solution post-intervention: GWHP_1_Marco de Carli Studio Ingegneria SA.jpeg
Solution post-intervention: GWHP_2_Marco de Carli Studio Ingegneria SA.jpeg
What is the Solution?

100% indirect Ground Water Heat Pump (GWHP) for heating/cooling and domestic hot water in combination with the solar PV plant in the roof of the building.

Why Does it work?

The production of thermal energy is guaranteed by a water-water heat pump with a primary medium of groundwater with 450 kW of thermal power capacity, while the refrigerating energy necessary for the air conditioning, of about 1'050 kW cooling power capacity, is ensured by a pumping station of water from the lake. In consideration of the fact that the lake water has a significant temperature difference depending on the seasonal trend and the depth of collection, in order to obtain an enough constant temperature and to allow an integral free-cooling function (10ºC at the point of use and 7ºC at the sampling point) it was necessary to go to a depth of 45 m due to the considerable length of the pipeline (approx. 1'000 ml.)

PROS
  • Geothermal power can be generated throughout the year on twenty-four-hour basis as it is not much dependent on ambient temperature and weather conditions exploitation low enthalpy geothermal (aquifers) resources for heating and cooling.
  • There is lower environmental impacts due to the exploitation of such geothermal resource.
CONS
  • This solution presupposed an accurate analysis of various aspects such as:
  • maintenance of the pumping station
  • periodic cleaning of collection hoods
  • housing and anchoring pipes
  • operating pressures in the pipes
  • power supply
Heating nominal power
450 kW
Heating efficiency
information not available
DHW nominal power
information not available
DHW efficiency
information not available
Cooling unit
Heat Pump
Cooling centralized/decentralized
Centralized
Cooling distribution system
Liquid
Cooling supply
Radiating Floor
Cooling nominal power
450 kW
Cooling efficiency
information not available
Ventilation type
Balanced Mechanical Ventilation
Ventilation centralized/decentralized
Centralized
Heat recovery efficiency
information not available
SFP if relevant
information not available
Additional documentation

Before retrofit

After retrofit

Before retrofit
Heat generator
information not available
After retrofit
Heat generator
Heat Pump
Before retrofit
Fuel type
information not available
After retrofit
Fuel type
Electricity
Before retrofit
Centralized/Decentralized
information not available
After retrofit
Centralized/Decentralized
Centralized
Before retrofit
Distribution system
information not available
After retrofit
Distribution system
Water
Before retrofit
Heating supply
information not available
After retrofit
Heating supply
Radiating Floor
Before retrofit
DHW same as heating system
information not available
After retrofit
DHW same as heating system
yes
Before retrofit
DHW heat generator
information not available
After retrofit
DHW heat generator
information not available
Before retrofit
DHW fuel type
information not available
After retrofit
DHW fuel type
information not available
Before retrofit
DHW centralized/decentralized
information not available
After retrofit
DHW centralized/decentralized
information not available

Assessment

Heating
Yes
Cooling
Yes
Ventilation
Yes
Heat generator
Heat Pump
Heating centralized/decentralized
Centralized (multi family house/non residential)
Heat supply
Radiating Floor
Heating existing distribution system
No
Circular approach - heating
No
Investment cost - heating
Medium High
Cooling generator
Geothermal Source Heat Pump
Cooling generator (Additional info)
Centralized (multi family house/non residential)
Cooling supply
Radiating Floor
Circular approach - cooling
No
Investment cost - cooling
Medium High
Ventilaiton strategy
Mechanical Ventilation System
ventilation centralized/decentralized
Decentralized (multi family house/non residential)
Heat recovery
Yes
Circular approach - ventilation
No
Investment cost - ventilation
Medium High

Location

Locarno, Switzerland - 200m
Climatic Zone:Dfc